The economic solution

Since about 12 years it is possible to bring up a prolapsed concrete floor with the aid of Celbeton Injection.

Is hereby cellular concrete (a lightweight concrete type) was injected via a laser-controlled system under the prolapsed floor so that the floor is pushed up.
A major advantage of the Fagro lift system is that heavy machinery or racks are often not need to be moved, they will be lifted up along with no problems.
This method was developed by Fagro and has already produced hundreds of satisfied customers in recent years. On the Celbeton product we give a lifetime warranty.

The solution is actually very simple and easy...

 

© Fagro 2024