Method

That it works is a fact. The procedure is as follows:
  • On the basis of the visitor report will be drilled according to a sophisticated pattern 5 cm diameter holes in which are anchored patented valves.
  • A special technique ensures that first the total floor separates from the substrate.
  • Hereinafter Celbeton is gradually dosed under the floor.
  • The process is controlled by laser equipment and controlled.
  • The holes are sealed and the floor is delivered clean.

Your floor problems are solved without demolition and piling.

 Drill injection holes
Drill injection holes

Celbeton injection
Injecting Celbeton and lasercheck

Elevating Prolapsed factory floor

Elevating Prolapsed factory floor